The fit-out process

From brief
to handover

How a Designo project runs, stage by stage: what happens, what you receive and what we’ll ask of you. One team carries it from the first conversation to the keys.

Office floor during fit-out
01

Consult

A free first conversation, online or at our office, about your brief, budget and references.

02

Estimate

An approximate estimate after the first call, then site measurements and a detailed requirement study.

03

Design

Space planning, a Vastu review where wanted, and 3D views of the proposed interior.

04

Build

Civil work, joinery, electrical, finishes and installation, run under ISO 9001 and 45001 practices.

05

Handover

Delivered on agreed timelines and backed by a 10-year warranty.

Stage by stage

What happens, and what you get

  1. 01

    Consult

    A free first conversation about your brief, team, budget, references and timeline.

    Online, at our office or on site
    Your brief, budget and references
    Free of charge
  2. 02

    Estimate

    An approximate estimate after the first call, then site measurements and a detailed requirement study.

    Approximate estimate after the first call
    Site survey and measurements
    Detailed requirement study
    Detailed estimate
  3. 03

    Design

    Space planning, a Vastu review where wanted, and 3D views of the proposed interior for you to review.

    Space planning and layouts
    3D views of the proposed interior
    Vastu review, where wanted
    Lighting and acoustic design
    Materials, finishes and furniture
  4. 04

    Build

    Civil work, joinery, electrical, finishes and installation, run under ISO 9001 and 45001 practices.

    Procurement of materials and furniture
    Civil work
    Carpentry and joinery
    Partitions, electrical, lighting and acoustics
    AV, networking, CCTV, access control and fire alarm
    Painting, carpets and blinds
    Quality and safety checks on site
  5. 05

    Handover

    Delivered on the agreed timeline and backed by a 10-year warranty.

    Testing and commissioning of every system
    Training for your team, with drawings and documents
    Handover on the agreed timeline
    10-year warranty
    Maintenance after handover

Before we start

What we’ll ask you for

The more of this we have early, the sooner we can give you a firm estimate and timeline.

Your brief: teams, headcount and the spaces you need01
A budget range and a target move-in date02
Floor plans or building drawings, if you have them03
Access to the site for measurements04
Your building’s fit-out rules, where the landlord or society sets them05

Payments

Paid in three stages

50%Advance

Before work starts.

40%Second stage

Fifteen days after work begins.

10%Balance

Seven days after completion.

This is how payments are usually staged. The schedule for your project is confirmed in your contract.

Occupied buildings

Working around your team

Office in use with works screened off

Many fit-outs happen in buildings that are already in use. Our ISO 45001 system governs how we manage risk on site to protect your employees, our contractors and visitors, and the hygiene we keep while work goes on around them.

We plan the order of work with you, so the business keeps running while the space changes.

More questions answered
45Day timelinesEfficient, dependable delivery.
10Year warrantyBuilt to last, backed by guarantee.
3×ISO certified9001 · 14001 · 45001.
VastuCompliant layoutsBuilt for balance and business success.